Level 2 charger with battery storage.
Up to 20 ports from a 100 A service.
Battery buffered Level 2 charging puts every Level 2 charger on battery storage: four charger families (Gust, Gust-48) clustered around a Draco ESS hub on the XEYAR shared DC bus. 8 to 20 ports per cluster, all running off existing 100 A service, typically with no transformer upgrade, for condo and strata garages, workplaces and depots. Storage rated −40 °C to +65 °C. Free shipping anywhere in Canada and a $0 KW Energy CMS subscription on KW Energy chargers.
Level 2 charger families for buffered clusters. One shared DC bus.
Each family is purpose-built for a specific use case. All four cluster on the XEYAR shared DC bus with a Draco ESS hub. Download the family spec sheet or request a configured quote.
Gust-48
ValueValue-tier 48 A Level 2. Single and dual configurations. IP65 and IK08 enclosure for indoor or outdoor use. Best for condo, strata and workplace overnight charging where you control access.
- Power per port
- 11.5 kW
- Enclosure
- IP65, IK08
- Authentication
- Auto-start, RFID opt.
- Monetization
- No
Gust
PremiumPremium 48 A or 80 A Level 2. Non-monetized. IP65 outdoor, status display. 19.2 kW per port at 80 A.
- Power per port
- 11.5 or 19.2 kW
- Enclosure
- IP65 outdoor
- Authentication
- Auto-start, RFID, mobile app
- Monetization
- No
Squall-48
PublicMonetized 48 A Level 2. Secure card payments by QR code, RFID, mobile app authentication. Site owners recover energy and operating cost without a full DCFC investment.
- Power per port
- 11.5 kW
- Enclosure
- IP65, IK08
- Authentication
- QR code card payment, RFID, app
- Monetization
- Yes · dynamic pricing
Squall
PremiumPremium monetized 48 A or 80 A Level 2. status display, QR code payments with Apple Pay and Google Pay, and per-port load balancing. 19.2 kW at 80 A.
- Power per port
- 11.5 or 19.2 kW
- Enclosure
- IP65
- Authentication
- QR code (card, Apple Pay, Google Pay), RFID, app
- Monetization
- Yes
Battery buffered Level 2 clusters. One quote away.
Browse all L2 cluster SKU configurations on the main Battery Buffered page, or download the L2 Cluster Overview PDF for the full architecture story plus technical specifications.
XEYAR battery storage certified to UL 9540, UL 9540A, UL 810A, IEC 62619 and CSA. Chargers cETLus certified (UL 2202 DC, UL 2594 and CSA C22.2 No. 280 Level 2).
Battery buffered Level 2 charging. Common questions.
Service capacity, port counts, charger families, condo and strata use, payments, warranty and lead time for buffered Level 2 clusters in Canada.
Can I add Level 2 chargers without upgrading my electrical service?
In most cases, yes. A battery buffered Level 2 cluster is designed to run 8 to 20 ports on an existing 100 A service (24 kW continuous). The Draco ESS covers the difference between grid input and charger demand, and KW Energy load management, the dynamic load management layer in KW Energy CMS, shares power between ports. A site assessment confirms your existing service and panel headroom, and your electrician confirms the design under the Canadian Electrical Code.
How many Level 2 ports can run on a 100 A service?
Clusters are configured from 8 to 20 ports, at 11.5 kW per port (48 A) or 19.2 kW per port (80 A). The featured configurations are Gust-48 with 8 or 12 ports, Squall-48 with 16 and Squall-80 with 20, each with a battery sized to the site’s use profile.
Which Level 2 charger family should I choose?
For staff, condo and strata residents, tenants or fleets that do not pay per session, choose Gust-48 (value) or Gust (premium, 48 A or 80 A). To charge drivers, choose Squall-48 (card payments by QR code) or Squall (card payments by QR code, 48 A or 80 A). The same families are sold standalone on our Commercial Level 2 page.
Does a buffered Level 2 cluster suit a condo or strata garage?
Yes. Gust-48 or Gust with RFID per resident and per-user energy tracking in KW Energy CMS fit shared parking, and the cluster keeps the building on its existing service. Sodium-ion and supercapacitor storage carry far lower thermal-runaway risk than lithium-ion, which simplifies siting in parking garages; your provincial inspector approves each installation.
Can drivers pay to charge on a buffered Level 2 cluster?
Yes, with Squall-48 or Squall: drivers pay by card, Apple Pay or Google Pay through a QR code on the charger, or by RFID or the app. KW Energy Pay, the automated settlement layer in KW Energy CMS, matches every session to the payment behind it and pays the site owner monthly. KW Energy supports time, session and kWh pricing; kWh billing in Canada follows Measurement Canada rules.
What warranty and certifications cover a Level 2 cluster?
The charger hardware carries a 2-year manufacturer warranty, in addition to your statutory rights, and the XEYAR battery carries a 10-year warranty. Charger warranty extends to 5 years (2 + 3) or 10 years (2 + 8) in total, sold separately, and charger hardware is backed by a 97% uptime SLA.
XEYAR battery storage certified to UL 9540, UL 9540A, UL 810A, IEC 62619 and CSA. Chargers cETLus certified (UL 2202 DC, UL 2594 and CSA C22.2 No. 280 Level 2).
How long does a buffered Level 2 cluster take to deliver?
Lead time is 60 to 90 days from order, with free shipping anywhere in Canada, and Level 2 clusters are at the shorter end. A conventional multi-port site that needs a service upgrade can wait months for the utility. See the EV charger installation timeline for the permit and inspection steps.