Skip to content
EV Charging
Home ChargersCommercial Level 2DC and Ultra-Fast ChargersBattery-Buffered EV ChargersPedestals and AccessoriesKW Energy App & CMSView all EV chargers
Battery Storage
PHOENIXDRAGONFLYDRACOLEVIATHANNOMADCORVUSView all XEYAR BESS
Renewables
SolarWindView renewables
Markets

EV charging

Fuel Stations and ForecourtsCharge Point OperatorsFleet and LogisticsHotels and HospitalityRetail and Commercial HubsMulti-Family and Real EstateWorkplace and CorporateHighways and Corridors

Energy and storage

Utilities and Grid OperatorsCommercial and IndustrialData Centers and TelecomSolar and Wind DevelopersMicrogrids and Off-Grid SitesHomeownersAll markets
Technology
Battery-Buffered ChargingSupercapacitor vs Sodium-IonCharge Management PlatformVPP and Grid ServicesAll technology
Finance
ROI CalculatorLCOS CalculatorProject SizerFinancial ModelsFinancing OptionsRebates and IncentivesFinance overview
About
About KW EnergyLeadershipPartnersInstallersContact
Resources
Case StudiesProjects and InstallationService and MaintenanceBlogNewsDownloads
Get a Quote Contact
Flagship Battery-Buffered System Patent Pending · USPTO + CIPO Powered by XEYAR technology

Battery buffered EV chargers.
Up to 720 kW per cluster from a 100 A service.

Battery buffered EV chargers built on the patent-pending XEYAR shared DC-bus architecture, with storage rated −40 °C to +65 °C for Canadian winters. Add high-power EV charging to an existing 100 A service, typically with no transformer upgrade and no long wait for your local utility (your site assessment confirms it). A flat grid draw also keeps the peak demand on your bill low. VPP-ready hardware ships today; grid-service programs are planned for 2027.

KW Energy load managementLoad management 10-year battery warranty10-yr warranty Free shipping anywhere in CanadaFree CA shipping
XEYAR Shared DC-Bus Architecture

How a battery buffered EV charger works: grid plus battery, not grid versus battery.

The patent-pending XEYAR design uses a shared DC bus where grid input and battery discharge are simultaneous and additive, not sequential. That single architectural choice is why a 100 A service can drive up to 720 kW of EV charging per cluster, typically without a transformer upgrade.

1
Input · Steady Trickle

Grid → DC Bus

A 100 A standard service feeds the bidirectional PCS, which converts AC to DC for the shared bus. 24 kW for L2 systems · 83.1 kW for DCFC (3-phase 480 V; sized per site for 208 V or 600 V services), flat, continuous, never spiked.

Same PCS regardless of battery chemistry.

2
Buffer · Draco ESS

Draco Hub on the Bus

Squall-48 sits on the DC bus and absorbs / releases on demand. Three storage tiers: Na-ion 5C (symmetric, 20K cycles, cost-optimized), SuperCap 3C (symmetric, 500K+ cycles, ultra-long life), and a 1C/2C outdoor cabinet for clusters above 150 kWh. Selected per installation.

Why 5C? Above 5C, the 83.1 kW grid limits the charge side, higher C-rates buy nothing. 5C is the engineered ceiling.

3
Output · Additive Power

DC Bus → Chargers

Charger power = grid + battery simultaneously. KW Energy CMS is designed to hold at least 50% of nameplate per active port, with KW Energy load management, the dynamic load management layer in KW Energy CMS, designed for EVEMS load-management designs under CEC Rule 8-106, as your electrician and inspector confirm. The battery itself is run by its own battery management system (BMS).

OCPP 1.6, 2.0.1 ready.

Patent Pending · USPTO + CIPO

Modular Battery-Buffered Clustered EV Charging System

The shared DC-bus architecture, energy management algorithms, multi-port distribution logic, and battery sizing methodology are covered by the XEYAR patent application (Patent Pending, USPTO + CIPO). Engineered with XEYAR Technologies, our battery technology partner. XEYAR Technologies

USAUSPTO CanadaCIPO

Typically no transformer upgrade

Designed to run on an existing 100 A service, so most sites skip the major utility upgrade and the long construction queue. Your site assessment confirms it.

VPP-ready hardware today

Bidirectional PCS and Draco ESS are designed for grid export. Grid-service programs are planned for 2027, with no hardware swap required.

At least 50% per active port

KW Energy load management is designed to hold at least half of nameplate power on every active port.

Three storage tiers

Draco supports Na-ion 5C (cost-optimized), SuperCap 3C (ultra-long life), and a 1C/2C outdoor cabinet for large-capacity sites.

Up to 720 kW total

Full-power L2 or DC Fast on a service that traditionally couldn’t support it. Cyclone 720 hub configuration.

Lower thermal-runaway risk

XEYAR battery storage certified to UL 9540, UL 9540A, UL 810A, IEC 62619 and CSA. Chargers cETLus certified (UL 2202 DC, UL 2594 and CSA C22.2 No. 280 Level 2). Na-ion and SuperCap storage carry far lower thermal-runaway risk than lithium-ion, which simplifies siting at indoor, condo and strata sites. Your inspector approves each installation.

−40 °C to +65 °C battery storage

The XEYAR storage is rated from a Canadian prairie winter to summer heat, with no HVAC required. Keeps charging below 0 °C, where many lithium systems restrict it.

Free shipping

Free shipping anywhere in Canada, with no duties or customs fees at delivery. Clusters ship in 60 to 90 days.

Two Buffered Cluster Lines

Battery buffered Level 2 and DC fast charging. Two power classes.

Buffered Level 2 for overnight condo and strata, workplace, and fleet-depot charging. Buffered DC Fast for high-turnover and corridor sites. Both built on the XEYAR shared DC bus.

For Overnight · Condo & Strata · Workplace · Depot

Buffered L2 Cluster

48 A or 80 A chargers (Gust, Gust-48) clustered with a Draco ESS hub on a shared DC bus. 8 to 20 ports per cluster, all running off a 100 A standard service.

8–20ports
Per Cluster
19.2kW
Per Port Max
100A
Grid Service
Charger Families Available
Gust-48 48 A · Non-monetized · Single & dual configs Value
Gust 48 A or 80 A · Non-monetized · IP65 Premium
Squall-48 48 A · Monetized · QR card payments Public
Squall 48 A or 80 A · Monetized · IP65 Premium
Example SKU: GUST48-B50N-12C = Gust 48 A · 50 kWh Na-ion · 12-port cluster
For Highway · Fleet Hub · Public DCFC

Buffered DC Cluster

Full-power DC fast charging, 30 kW to 720 kW per cluster, on a 100 A standard service. Gale, Storm, Tempest, Cyclone and Hurricane families, all clustered on the XEYAR shared DC bus.

2–4dispensers
Per Cluster
720kW
Per Cluster Max
100A
Grid Service
Charger Families Available
Gale 30 / 40 kW · Workplace & small commercial Entry
Storm 120–360 kW · Workhorse DCFC Workhorse
Tempest 240 / 360 kW · Ultra-fast urban Ultra-fast
Cyclone 240–720 kW · 4-dispenser HPC hub Hub
Hurricane Custom engineered · 30 kW to 1 MW+ Custom
Example SKU: TEMPEST240-B150N-2C = Tempest 240 kW · 150 kWh Na-ion · 2-port cluster
All Cluster Configurations

Battery buffered cluster models. Sized to your site.

Filter by family type. Battery sizes shown are our strategic defaults per port count, every cluster is custom-sized to your site’s exact load profile, port count, and operating environment.

Ready-to-order XEYAR battery-buffered DC chargers (240 kW, 360 kW and 360 kW liquid-cooled) are in our store: see XEYAR from . Cluster configurations below are quoted per site, priced in CAD. Clusters ship in 60 to 90 days, free anywhere in Canada.

L2 · 48A Squall48-B20N-8C
Entry · Condo / Workplace

Gust-48 48 · 8-Port Cluster

Ports × Power8 × 11.5kW
Battery20kWh Na or SC
Grid100A · 24kW
VPP-ready Grid-service programs planned 2027
L2 · 48A GUST48-B50N-12C
Popular · Premium IP65

Gust 48 · 12-Port Cluster

Ports × Power12 × 11.5kW
Battery50kWh Na or SC
Grid100A · 24kW
VPP-ready Grid-service programs planned 2027
L2 · 48A SQUALL48-B50N-16C
Monetized · QR card payments

Squall-48 48 · 16-Port Cluster

Ports × Power16 × 11.5kW
Battery50kWh Na or SC
Grid100A · 24kW
VPP-ready Grid-service programs planned 2027
L2 · 80A SQUALL80-B60N-20C
Premium · Monetized IP65

Squall 80 · 20-Port Cluster

Ports × Power20 × 19.2kW
Battery60kWh Na or SC
Grid100A · 24kW
VPP-ready Grid-service programs planned 2027
DC · 30kW GALE30-B20N-2C
Entry DCFC · Workplace

Gale 30 · 2-Port Cluster

Ports × Power2 × 30kW
Battery20kWh Na / 30 SC
Grid100A · 83.1kW
VPP-ready Grid-service programs planned 2027
DC · 120kW STORM120-B80N-2C
Workhorse · Highway

Storm 120 · 2-Port Cluster

Ports × Power2 × 120kW
Battery80kWh Na / 100 SC
Grid100A · 83.1kW
VPP-ready Grid-service programs planned 2027
DC · 240kW STORM240-B150N-2C
Highway corridor · Forecourt

Storm 240 · 2-Port Cluster

Ports × Power2 × 240kW
Battery150kWh Na / 200 SC
Grid100A · 83.1kW
VPP-ready Grid-service programs planned 2027
DC · 360kW STORM360-B225N-2C
Premium DCFC · Fleet

Storm 360 · 2-Port Cluster

Ports × Power2 × 360kW
Battery225kWh Na / 300 SC
Grid100A · 83.1kW
VPP-ready Grid-service programs planned 2027
DC · 240kW TEMPEST240-B150N-2C
Ultra-fast · Premium urban

Tempest 240 · 2-Port Cluster

Ports × Power2 × 240kW
Battery150kWh Na / 200 SC
Grid100A · 83.1kW
VPP-ready Grid-service programs planned 2027
DC · 240kW CYCLONE240-B80N-4D
4-dispenser HPC hub

Cyclone 240 · 4 Dispensers

4 dispensers240kW total
Battery80kWh Na / 100 SC
Grid100A · 83.1kW
VPP-ready Grid-service programs planned 2027
DC · 480kW CYCLONE480-B150N-4D
Fleet depot · Freight corridor

Cyclone 480 · 4 Dispensers

4 dispensers480kW total
Battery150kWh Na / 200 SC
Grid100A · 83.1kW
VPP-ready Grid-service programs planned 2027
DC · 720kW CYCLONE720-B225N-4D
High-power hub · HD trucks

Cyclone 720 · 4 Dispensers

4 dispensers720kW total
Battery225kWh Na / 300 SC
Grid100A · 83.1kW
VPP-ready Grid-service programs planned 2027

12 featured configurations shown. Need a different power tier or port count? Talk to engineering →

Grid services (VPP)

VPP-ready hardware. Grid-service programs are planned for 2027.

Every battery buffered EV charger cluster ships with a bidirectional power conversion system and Draco ESS designed for grid export. Grid-service (virtual power plant) programs are not available yet. They are planned for 2027, and the hardware you install today will not need a swap to join them.

Today

A buffered charger

The battery covers charging peaks, so high-power charging runs on the service you already have, typically with no transformer upgrade.

Built in

Ready for export

Bidirectional power conversion and battery storage designed for grid export, with KW Energy load management managing the chargers and the battery run by its own BMS.

Planned 2027

Grid-service programs

When programs launch, eligibility and any payments will depend on your utility or provincial grid operator, the program rules and how the battery is used.

We do not quote VPP revenue today. Your quote covers charging hardware, storage, installation planning and KW Energy CMS, sized for your site.

Get a battery-buffered quote
Buffered vs Non-Buffered

Battery buffered vs conventional EV charging. Same site, different architecture.

Reference 12-port Gust 48 A workplace deployment. What each path actually requires, in time, infrastructure, and recurring cost structure.

Engineering comparison. Architecture and feasibility, not project pricing. For project-specific quotes in CAD including your local utility’s demand charges (and the Global Adjustment in Ontario) and install scope, request a site assessment →
Scenario: 12 × Gust 48 A ports (11.5 kW each) · Existing service: 100 A · 24 kW
Metric Conventional Non-Buffered XEYAR GUST48-B50N-12C Winner
Required Service 800 A upgrade 100 A existing
Utility Upgrade Required · transformer build Typically none
Time to Install 6–9 months (utility queue) 60–90 days lead time
Indoor / MURB Siting Lithium storage rules & suppression Lower thermal-runaway risk
Operating Range Varies by chemistry −40 °C to +65 °C
Peak demand on the bill Up to about 138 kW when all 12 ports run Grid draw capped near 24 kW
Shipping Varies by supplier Free anywhere in Canada, no duties at delivery
Grid services (VPP) Not possible VPP-ready · programs planned 2027
CMS Subscription Vendor subscription per port $0 KW Energy CMS subscription on KW Energy chargers
Architecture Verdict Utility-dependent · high recurring cost Grid-light · VPP-ready · lower OPEX
10yr
Battery warranty · 2 yr hardware
FREE
Shipping anywhere in Canada
$0/mo
CMS subscription on KW Energy chargers
−40° / +65°C
Battery operating range · No HVAC
Certified · Compliant
cETLus UL 2594 (L2) UL 2202 (DC) CSA C22.2 No. 280 (L2) ENERGY STAR (select models) OCPP 1.6, 2.0.1 ready IEC 61851 NACS SAE J3400 Patent Pending · USPTO + CIPO UL 9540 (battery) UL 9540A (battery) UL 810A (battery) IEC 62619 (battery) CSA (battery)

XEYAR battery storage certified to UL 9540, UL 9540A, UL 810A, IEC 62619 and CSA. Chargers cETLus certified (UL 2202 DC, UL 2594 and CSA C22.2 No. 280 Level 2).

Ready for buffered?

EV charging without a transformer upgrade. Keep your 100 A service.

Frequently Asked

Battery buffered EV charger questions. Straight answers.

Battery buffered EV charger architecture, demand charges, inspection, winter performance, VPP roadmap, warranty and deployment time: the answers Canadian engineers and procurement managers ask first.

What is a battery buffered EV charger, and how is it different from a regular DC fast charger?

A battery buffered EV charger includes an on-site energy storage system that sits between the grid and the chargers. Instead of pulling all its power straight from the grid (which needs a much larger electrical service), the system stores energy in the buffer and releases it when EVs are charging.

That lets you deliver high charging power on a small grid connection. A regular 240 kW DC fast charger needs a 240 kW grid connection. A battery-buffered Tempest 240 cluster delivers 240 kW per port from a 100 A standard service while the buffer has charge, because the storage covers the peaks and the grid recharges it between sessions. For a plain-language walkthrough, read EV charging without panel upgrade work.

Do I really not need a utility transformer upgrade?

In most cases, no transformer upgrade is required. Battery-buffered clusters are designed to run on a standard 100 A service (24 kW continuous for Level 2 systems, 83.1 kW for DC fast systems on 3-phase 480 V, sized per site for 208 V or 600 V services). The Draco ESS covers the difference between grid input and charger demand.

This typically avoids the cost of a major transformer upgrade and the long wait for construction by your local utility. We recommend a site assessment to confirm your existing service, panel headroom and electricity rate. Where software alone is enough, dynamic load management may be the simpler option.

How does a battery-buffered cluster affect demand charges and the Ontario Global Adjustment?

Most Canadian commercial electricity rates bill peak demand (kW or kVA) each month. A buffered cluster draws a flat load from the grid (about 24 kW for Level 2 clusters, 83.1 kW for DC clusters) while the battery covers the charging peaks, so the peak demand on your bill stays close to that flat draw instead of the sum of every charger.

In Ontario, the Global Adjustment is a large part of the commercial bill. Class B customers pay it per kWh, and Class A customers pay it based on their demand during the province’s peak hours, where a flat, capped grid draw helps. Your site assessment models your actual rate and customer class.

Sodium-ion or supercapacitor: which battery chemistry should I choose?

Both chemistries sit on the same shared DC bus and power conversion system. Sodium-ion (5C, about 20,000 cycles) is the cost-optimized choice for most sites. Supercapacitor (3C, 500,000+ cycles) suits sites with many short, high-power sessions where cycle life matters most. Clusters above 150 kWh use a 1C/2C outdoor cabinet. Our engineers select the chemistry for each installation.

XEYAR battery storage certified to UL 9540, UL 9540A, UL 810A, IEC 62619 and CSA. Chargers cETLus certified (UL 2202 DC, UL 2594 and CSA C22.2 No. 280 Level 2).

Will an electrical inspector approve a battery-buffered installation?

Under the Canadian Electrical Code, Rule 8-106 lets the calculated load be reduced when an EV energy management system (EVEMS) controls the chargers. KW Energy load management, the dynamic load management layer in KW Energy CMS, manages charger power; your electrician confirms how the design meets Rule 8-106, and your provincial inspector (ESA in Ontario, Technical Safety BC, RBQ / CMEQ rules in Quebec) approves each installation.

XEYAR battery storage certified to UL 9540, UL 9540A, UL 810A, IEC 62619 and CSA. Chargers cETLus certified (UL 2202 DC, UL 2594 and CSA C22.2 No. 280 Level 2).

Sodium-ion and supercapacitor storage carry far lower thermal-runaway risk than lithium-ion, which simplifies siting at condos, strata and other multi-unit buildings. Energy-storage requirements in the building and fire codes your province adopts still apply site by site, and we provide the documentation package your engineer and inspector need.

Do battery-buffered clusters work in a Canadian winter?

Yes. XEYAR storage is rated −40 °C to +65 °C with no HVAC required, and it keeps charging below 0 °C, where many lithium systems restrict it. The KW Energy chargers on the cluster are rated −30 °C to +50 °C.

How long does it take from order to commissioning?

Lead time for battery-buffered clusters is 60 to 90 days from order, depending on configuration. Level 2 clusters are at the shorter end; DC clusters, especially Cyclone 720 hubs with a cabinet and dispensers, take longer.

The big time saving is not waiting for utility infrastructure: a conventional 12-port Level 2 site often needs a transformer or service upgrade that can take 6 to 9 months. The equivalent GUST48-B50N-12C buffered cluster runs on the existing 100 A service. See the EV charger installation timeline for permits and utility steps.

What warranty covers a battery-buffered cluster?

The charger hardware carries a 2-year manufacturer warranty, in addition to your statutory rights, and the XEYAR battery carries a 10-year warranty. Charger warranty extends to 5 years (2 + 3) or 10 years (2 + 8) in total, sold separately, and charger hardware is backed by a 97% uptime SLA; ask for terms in your quote.

Can a battery-buffered cluster provide grid services (VPP)?

Every battery-buffered cluster ships VPP-ready hardware: the bidirectional power conversion system and Draco ESS are built for grid export and grid services.

Grid-service programs are planned for 2027 and are not available yet, so today the hardware works as a buffered charger only, with no hardware swap needed later. We do not quote VPP revenue.

Is shipping free in Canada?

Yes. Shipping is free anywhere in Canada, with no duties or customs fees at delivery. Clusters ship in 60 to 90 days. Your quote lists anything outside standard freight, such as cranes or site rigging for large cabinets.