DC fast chargers,
Level 3 for business.
30 to 720 kW.
Level 3 (DC fast charging) for Canadian sites in four architectures: wall-mount, standalone, premium-screen and split-cabinet, from entry retail to highway hubs. Every DC fast charger ships with CCS1 plus a built-in NACS cable, cETLus certified to UL 2202, with free shipping anywhere in Canada. Filter by power below to see the families that fit your site.
Storm · Flagship Non-Buffered DC
What power do you need?
Pick a power band and the family grid below filters to families that ship at that level. Rule of thumb: more dwell time = lower kW.
Showing all 4 families · 20 SKUs total
Selection updates the families below
Gale
Compact wall-mount DCFC for sites that can’t afford a column.
Storm
The workhorse standalone, with the widest power range and connector options in the lineup.
Tempest
Premium DCFC with 42-inch advertising display. Branded networks, retail-grade UX.
Certified, compliant, covered.
Every Level 3 (DC fast) charger in the lineup ships outdoor-ready, network-compatible and warranty-backed, free anywhere in Canada in 60 to 90 days, with the KW Energy charger management system at a $0 CMS subscription on KW Energy chargers.
-
cETLus certified · UL 2202
-
IP54 Outdoor Rated
-
OCPP 1.6, 2.0.1 ready
-
2-Year Warranty · $0 KW Energy CMS Subscription
Cyclone
One power cabinet, multiple dispensers. One cabinet’s power shared across stalls at gas-station forecourts and hyper-hubs.
Which DC fast charger? Form factor before power.
Power gets all the headlines, but the physical architecture makes or breaks deployments. Wall, standalone or split-cabinet: pick based on your site, then dial in kW. Short on electrical service? See battery-buffered DC clusters.
See Storm in 16 seconds
Our standalone DC fast charger, 40 to 360 kW, with a payment terminal built in.
Wall-Mount
No column. No pad. Bolt to the wall, run conduit, energize.
- A solid wall to mount to (parking structure, building façade)
- 1 or 2 stalls and don’t want to lose space to a column
- Lower-power need (commute charging, fleet midday top-up)
- Tight retail footprint, short permitting tolerance
Standalone
All-in-one column. Plant it on a pad, run conduit, energize.
- 1 to 4 stalls, each at independent power levels
- An open lot or parking surface (concrete pad needed)
- Mid-to-high power need (40 to 360 kW)
- Branded retail or hospitality where the kiosk is the customer touchpoint
Split-Cabinet
One cabinet feeds up to 12 dispensers. Power flexes where vehicles need it.
- 4 or more stalls (highway hub, large public network, large fleet)
- Need for dynamic power-sharing across stalls
- Lower per-port demand charges as a priority
- Plans to add dispensers on one power cabinet as traffic grows
Every DC fast charger SKU. Four families.
Every DC fast charger SKU we sell: power, connectors, liquid-cooling and intended use. Live prices load from our store in each band header. Click any row to open that family’s product page. Need a formal quote with civils, transformer, and install? Request a site assessment.
| SKU | Power | Connectors | Liquid-Cooled | Notes |
|---|---|---|---|---|
| GALE-30 | 30kW | CCS1 | No | Entry retail · single bay |
| GALE-40 | 40kW | CCS1 | No | Wall-mount · tight footprint |
| SKU | Power | Connectors | Liquid-Cooled | Notes |
|---|---|---|---|---|
| STORM-40 | 40kW | CCS1 | No | Workplace · low-volume retail |
| STORM-60 | 60kW | CCS1NACS | No | Mid-power retail · 30-min dwell |
| STORM-120 | 120kW | CCS1NACS | No | QSR · 20-min dwell |
| STORM-180 | 180kW | CCS1NACS | No | High-traffic retail |
| STORM-200 | 200kW | CCS1NACS | No | Highway · sub-15 min dwell |
| STORM-240 | 240kW | CCS1NACS | No | Highway · multi-stall hubs |
| STORM-360 | 360kW | CCS1NACS | No | 350-kW class · dual-cable |
| STORM-360-LC | 360kW | CCS1NACS | Yes | 350-kW class · liquid-cooled cable |
| SKU | Power | Connectors | Liquid-Cooled | Notes |
|---|---|---|---|---|
| TEMPEST-240 | 240kW | CCS1NACS | No | Branded retail · large screen |
| TEMPEST-360 | 360kW | CCS1NACS | No | 350-kW class · dual-cable |
| TEMPEST-360-LC | 360kW | CCS1NACS | Yes | 350-kW class · liquid-cooled cable |
| SKU | Power | Configuration | Liquid-Cooled | Notes |
|---|---|---|---|---|
| CYCLONE-240C | 240kW | Power Cabinet | n/a | Feeds up to 4 dispensers |
| CYCLONE-360C | 360kW | Power Cabinet | n/a | Mid-hub · power-sharing |
| CYCLONE-480C | 480kW | Power Cabinet | n/a | Highway hub · 4–6 dispensers |
| CYCLONE-720C | 720kW | Power Cabinet | n/a | Hyper-hub · up to 12 dispensers |
| CYCLONE-DISP2 | n/a | 2-Connector Dispenser | n/a | Pairs with any Cyclone cabinet |
| CYCLONE-240-4D | 240kW | Cabinet + 4 Dispensers | n/a | Turnkey 4-stall hub |
| CYCLONE-360-4D | 360kW | Cabinet + 4 Dispensers | n/a | Turnkey 4-stall · higher headroom |
Need DCFC where the grid says no?
Some sites can’t get the utility service for a 240 kW DC fast charger: the transformer is full, the upgrade is a long wait, or the demand charge math doesn’t work. XEYAR is our patent-pending (USPTO + CIPO) battery-buffered DC fast charger: 240 or 360 kW at the vehicle, and clusters up to 720 kW on a 100 A service, rated −40 °C to +65 °C for Canadian winters.
- The utility quoted months of waiting and a costly transformer upgrade
- Demand charges could add thousands of dollars a month per port
- You want VPP-ready hardware (grid-service programs are planned for 2027)
- Site needs charging today, the grid says next year
up to 720 kW
programs 2027
Match your site type to the right family.
Four DC fast charging site types, four playbooks. Each card recommends a family pairing and points to our Markets page for deeper guidance: site design, electrical pre-work, demand-charge modelling, and provincial programs.
Highway Corridor
Travelers stop 20 to 40 minutes. Power and reliability are the brand. Multi-stall hubs win.
Quick-Service Retail
Coffee runs, fast casual, convenience. 15 to 30 min dwell, so every minute counts. Premium branding helps.
Fleet Hub
Last-mile, transit, drayage. Mid-day top-ups. Power-sharing across stalls is critical.
Public Network
Multi-site charging operators. Brand consistency, OCPP roaming, payment processing across stalls.
Be one of our first DC fast charging references.
We’ve shipped Level 2 systems to fleet, hospitality and gas-station operators. The DC fast charger line is available to order now, with a 60 to 90 day lead time. Real DC fast charging testimonials will live here as sites go online.
Be our first DCFC reference.
The first DC fast charging operators to deploy KW Energy hardware can be featured here, with permission, alongside install photos, demand-charge before/after numbers, and a brief operator quote. Ask about reference pricing for sites that agree to a case study at energization. Start with a site assessment.
Level 3 and DC fast charger questions.
Nine questions Canadian operators ask when planning their first or fiftieth Level 3 (DC fast charging) site. Don’t see yours? Reach our DC fast charging team.
Is a Level 3 charger the same as a DC fast charger?
How fast is a DC fast charger compared to Level 2?
How much does a DC fast charger cost in Canada?
Which connectors do KW Energy DC fast chargers support?
Can I install a DC fast charger without a transformer upgrade?
What is the typical install timeline for a DC fast charger?
Will demand charges make a DC fast charger expensive to run?
Which DC fast charger family should I choose?
What warranty and software come with a KW Energy DC fast charger?
Show us your site.
Send a satellite photo, your panel schedule and your monthly utility bill, and we’ll come back with a power study, transformer-upgrade verdict, demand-charge forecast, and provincial program check, priced in CAD. Usually within 3 business days. No commitment.