Description
Gale brings DC fast charging, what most Canadians call Level 3, to sites with a modest electrical service: 30 or 40 kW in a wall or pedestal unit, with card payments built in and a rating down to -30 °C.
Who it is for
Workplaces, car dealerships, condo and rental buildings, and fleets that need faster turnaround than Level 2 without a large DC installation.
Payments and software
KW Energy Pay, the automated settlement layer in KW Energy CMS, matches every paid session to the card payment behind it and pays the site owner monthly, in Canadian dollars. Plans that collect payment from drivers carry a per-session fee, paid by the driver. KW Energy CMS is included, with a $0 CMS subscription on KW Energy chargers. KW Energy supports time, session and kWh pricing; kWh billing in Canada follows Measurement Canada rules.
Planning the install
DC fast chargers are installed by a licensed electrician under the Canadian Electrical Code (CEC) Section 86, with provincial permits and inspection (ESA in Ontario, Technical Safety BC, RBQ and CMEQ rules in Quebec). The charger takes a 480 V three-phase supply; many Canadian commercial services are 600 V or 208 V, so your electrician sizes any step-down transformer during the site assessment. Civil works, electrical work and any service upgrade are quoted per site. Request a quote or read about EV charger installation.
Specifications
| Power | 30 kW or 40 kW |
|---|---|
| Output current | 132 A (30 kW), 150 A (40 kW); air-cooled |
| Input | 480 V AC ±15%, 3-phase, 45 to 65 Hz |
| Output voltage | 200 to 1000 V DC |
| Mounting | Wall or pedestal |
| Connectors | CCS1, plus a built-in NACS cable |
| Ports | 2 or 4 |
| Enclosure | IP54 |
| Display | 7 inch display |
| Payments | Payment terminal for card payments; RFID; KW Energy app |
| Connectivity | Wi-Fi, 4G, Ethernet; OCPP 1.6, 2.0.1 ready |
| Power factor | ≥ 0.99 above 50% load |
| Operating temperature | -30 to +50 °C (-22 to 122 °F) |
| Certifications | cETLus certified to UL 2202 |
| Lead time | Built to order, 60 to 90 days |
| Warranty | 2-year manufacturer warranty, in addition to your statutory rights; extendable to 5 years (2 + 3) or 10 years (2 + 8), sold separately |
Warranty, shipping and support
2-year manufacturer warranty, in addition to your statutory rights. Extendable to 5 years (2 + 3) or 10 years (2 + 8) in total, sold separately. Backed by a 97% uptime SLA. Sales and support every day, 7 a.m. to midnight Eastern. Built to order and delivered in 60 to 90 days. Free shipping anywhere in Canada, with no duties or customs fees at delivery. Prices are shown before tax; GST/HST is added by province at checkout.
Frequently asked questions
How fast does a 30 kW charger charge an EV?
Much faster than Level 2: a 30 to 40 kW charger suits dwell times of about an hour, such as dealerships and workplaces. Actual speed depends on the vehicle and, in winter, on battery temperature.
Does Gale work with Tesla vehicles?
Yes. Gale has a CCS1 connector and a built-in NACS cable.
What electrical service does Gale need?
A 480 V three-phase supply. Your licensed electrician and our team size it, and any step-down transformer from a 600 V service, during the site assessment.


Reviews
There are no reviews yet.